
One tree, one address
Every zone, plot, row and tree gets a code, a QR code and a place on the map.


How might one system make a farm of nearly 18,000 trees easy to manage, down to a single tree?
Every plan, work order, supply and log had to point back to one tree, across zones, plots and rows.
Desk research: the farm's public figures and the scope of its data
Doing Codes zones, plots, rows and trees
Pain Nearly 18,000 trees to tell apart
Design → A code, a QR code and a map spot at every level
Doing Sets norms and a plan over seven growth stages
Pain Norms, plans and logs must line up stage by stage
Design → One calendar of seven stages, with labour, supplies and tools
Doing Confirms the plan into work orders
Pain Supplies can run short once work starts
Design → Stock is checked at confirm; a shortfall opens a purchase request
Doing Team leaders run task lines in the field
Pain Closing work waits for the office
Design → The team leader can complete the order, if allowed
Doing Closes the season and scores staff
Pain Scores with no evidence behind them
Design → Monthly scores sit beside each person's completed orders
The farm's own figures, 4 durian zones, 30 plots and 632 rows, became the levels of every tree code.
A scope map sorted the master data into 14 groups; about 14 were designed in full.
Norms, plans and the farming log had to share seven growth stages, with labour, supplies and tools per stage.

The scope map of master-data catalogs: about 90 in 14 groups.

One chain from master data to staff evaluation, with branches for pest alerts and stock shortfalls.

Every zone, plot, row and tree gets a code, a QR code and a place on the map.

Confirming a work order checks stock, and a shortfall links straight to a purchase requisition.

Monthly scores sit beside the work orders the person actually completed.
Notes

How can a farm with nearly 18,000 trees be managed easily with technology? The farm grows durian across zones, lots and rows, and the system had to follow work down to a single tree.

The data runs on two axes. Space: zone, area, lot, row and tree, each level with a code, a QR and a map polygon. Time: season, planting batch, seven growth stages and the tasks inside them.

Master data sets the norms for each stage. A tree profile feeds a cultivation plan with a Gantt view. Confirmed plans become work orders, finished work becomes the cultivation log, and the log feeds staff evaluation. Stock is checked when a work order is confirmed and can trigger a purchase request.

The design file carries its own process evidence: a scope map of about 90 master-data catalogs, numbered requirement boards, sketch wireframes next to hi-fi screens, layout trials, storyboards for failure and success, and notes for developers.

Six desktop modules, from master data to warehouse, plus a mobile app for field work.

One home for work orders, one status vocabulary, permissions for the whole ERP, and one glossary for units and growth stages.







